PV agreements (SDEA) in OnePV
Two companies share one clock
Safety data exchange agreements tracked from signature to termination, with alerts before obligations and renewals fall due.
The SDEA module tracks every agreement and obligation, on a platform built for 21 CFR Part 11, EU Annex 11 and GAMP 5, with IQ/OQ/PQ validation included.
Clause 4.2 of a sample agreement drawn as a fifteen-day dial. Corvane Pharma, the distributor, first receives a serious case on Thu 8 Oct 2026, Day 0, and must send it to Northbridge Pharma, the marketing authorisation holder, within 3 calendar days, by Sun 11 Oct. In the EU the reporting clock started when Corvane received the case, so Northbridge has the remaining 12 days, to Fri 23 Oct, Day 15, to report it. Corvane's three days stand taller and lit; Northbridge's twelve are lavender.
One agreement, three kinds of clock
Each obligation in the sample agreement runs from a case, from the calendar or from the agreement’s own dates, and each has its alert before it falls due.
| Clause | Obligation | From and to | Clock |
|---|---|---|---|
| From each caseDay 0 is the first receipt by either company (clause 1.4) | |||
| 4.2 | Serious cases | Corvane to Northbridge | 3 calendar days |
| 4.3 | Non-serious cases | Corvane to Northbridge | 30 calendar days |
| 4.5 | Follow-up information | Corvane to Northbridge | As for the first report |
| On a scheduleThe same dates every period | |||
| 5.1 | Local literature, Spain and Portugal | Corvane | Weekly |
| 6.1 | Reconciliation of exchanged cases | Both companies | Monthly, by the 10th |
| 7.2 | Sales data for the PSUR | Corvane to Northbridge | 30 days after the data lock point |
| From the agreement’s datesIts review and its term | |||
| 11.1 | Review of the agreement | Both companies | Every 12 months from 1 Apr |
| 12.1 | End of term | Both companies | 31 Mar 2028 |
Sample agreement for Exampril between Northbridge Pharma, the MAH, and Corvane Pharma, its distributor in Spain and Portugal. The clauses, terms and companies are fictional.
Where the clock starts
In the EU the clock starts when either company first receives the case, so the partner’s days come out of the fifteen. In the US a distributor named on the label can send serious reports to the applicant within 5 calendar days, and the applicant’s 15 days start from its own receipt.
Corvane sends it by Sun 11 Oct, Day 3. Northbridge reports it by Fri 23 Oct, Day 15: its fifteen days started when Corvane received the case.
GVP Module VI, VI.B.7 · ICH E2D(R1), 5.2
The distributor sends it to the applicant within 5 calendar days, by Tue 13 Oct. The applicant reports it by Wed 28 Oct: its 15 days start from its own receipt.
The distributor keeps a copy of each report, the dates it received and sent it, and the applicant’s name and address.
21 CFR 314.80(c)(1)(i) and (iii)
Sample dates for one serious, unexpected case. In the EU every serious case is due within 15 days; the US 15-day Alert report covers serious and unexpected cases.
From signature to termination
Each date in the agreement’s life is tracked, with an alert by email before it falls due.
- 3 Feb 2025Partner collaboration set upCorvane Pharma, Spain and Portugal
- 24 Mar 2025Version 1 signed by bothIn force from 1 Apr 2025
- 1 Apr 2026Annual review: version 2Clause 4.2 in business days
- 10 Sep 2026Version 3 signedClause 4.2 in calendar days, in force from 1 Oct 2026
- 1 Mar 2027Review alertThe next review is due on 1 Apr 2027
- 1 Dec 2027Renewal alert, by emailFour months before the end of term
- 31 Mar 2028End of termRenewed, or terminated
Sample term, drawn to scale. The bar is lit to 1 Oct 2026, when version 3 came into force.
Version 3, signed by both companies
Corvane’s head of PV reviewed, uploaded and signed in the same record as Northbridge’s QPPV: checked out, changed under change control, approved with electronic signatures, published.
| When | Who | What | Version |
|---|---|---|---|
| 1 Sep 2026 09:12 | PV agreements lead, Northbridge | Checked out version 2 for its annual change | v2 |
| 1 Sep 2026 10:40 | PV agreements lead, Northbridge | Clause 4.2: 3 business days 3 calendar days. Checked in under change control CC-EXAMPLE-031 | Draft v3 |
| 3 Sep 2026 15:05 | Head of PV, Corvane Invited partner user | Uploaded Corvane’s weekend cover procedure | Draft v3 |
| 7 Sep 2026 11:30 | Head of PV, Corvane Invited partner user | ApprovedElectronic signature · meaning: approval | Draft v3 |
| 10 Sep 2026 14:22 | QPPV, Northbridge | ApprovedElectronic signature · meaning: approval | Draft v3 |
| 14 Sep 2026 09:00 | Published | Version 3 effective 1 Oct 2026; version 2 superseded | v3 |
Sample record. People appear by role; the companies are fictional.
Audit trailEvery field change is versioned and attributable, with e-signature where required.
ValidationBuilt for 21 CFR Part 11 and EU Annex 11. IQ/OQ/PQ validation is part of every engagement.
What the agreement must now say
Since 12 February 2026, EU law lists what a pharmacovigilance subcontract must contain. The sample agreement, against that list:
- The roles and responsibilities of the partner
- Clauses 2.1 to 2.6
- Its obligation to exchange safety data with the MAH, and how
- Clauses 4.1 to 4.5
- The inspection and audit arrangements
- Clause 9.1
- Its agreement to be audited by or for the MAH, and inspected by the competent authorities
- Clause 9.2
- No onward subcontracting without the MAH’s written consent
- Clause 10.1
Implementing Regulation (EU) 2025/1466, amending Implementing Regulation (EU) No 520/2012, Article 6(3) and 6(4). Sample clause numbers.
- Listed in the PSMF
- The list of subcontracts, with the products and territories each one covers, goes in the annex to the pharmacovigilance system master file: Annex B.Implementing Regulation (EU) No 520/2012, Articles 3 and 6(2); GVP Module II
- Shown on request
- Individual agreements are made available to the authorities on request and during inspections. The MHRA expects the agreements listed in the UK PSMF to be readily available.GVP Module II, II.B.4.2; MHRA, GPvP inspections
- Reconciled
- When safety data passes between companies under an agreement, a confirmation or reconciliation shows that every report arrived.GVP Module VI, VI.B.4
Also in OnePV
- Case intake
Email, web forms, call centre (MICC) and partner reports in one triage queue.
- Safety database
ICSR processing, MedDRA and WHODrug coding, narratives, quality and medical review.
- Signal detection
PRR, ROR and EBGM across your data plus FAERS, EVDAS and VAERS, with a recorded decision for every signal.
- Literature management
PubMed and Embase articles are screened, and relevant ones become cases inside the safety workflow.
One system for patients, medical devices, cosmetics and veterinary medicines.
Bring an agreement due for review
Anonymised or made up. We will set it up with you, from its clauses to its renewal alert.